Local Law 97 penalty estimate
82 FULTON STREET: $86,358/year in fees starting in 2030
Loading map
What would the estimated penalty be in 2030, assuming nothing changes?
$86,358/year
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 82 FULTON STREET will be 322 tons over the cap.
- Penalty is $268/ton over the cap, $86,358 total
647 ton cap322 over
What is the estimated penalty for 82 FULTON STREET right now?
$31,497/year
- NYC caps a building's yearly greenhouse gas emissions.
- 82 FULTON STREET is 118 tons over the emissions cap.
- Penalty is $268/ton over the cap, $31,497 total
1,073 ton cap118 over
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 1,073 to 647 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 1,191 to 969 tons.
- Energy use is held the same.
- Tons over go from 118 to 322 tons.
How much would the building need to cut its emissions to avoid the penalty?
34% less emissions than today
- This building must emit 34% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 82 FULTON STREET?
3/100, grade D
- 82 FULTON STREET scores 3 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 121 kBtu per sq ft a year.
DCBA
30100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Manhattan
- 1980 LEXINGTON AVENUE$1,756,457 a year from 2030
- 13 EAST 22 STREET$10,002 a year from 2030
- 95 Christopher St & 218 West 10th St$14,308 a year from 2030
- 208 West 119th Street$168,675 a year from 2030
- 51 EAST 87 STREET$28,687 a year from 2030