This is what a portfolio review looks like, for a made-up portfolio of 12 buildings. The buildings and findings are illustrative. The penalty and emissions figures are calculated with the FeeWarden method.
Your portfolio’s path
to the 2030 caps
Sample portfolio · 12 buildings · 2.0 million sq ft
Your portfolio at a glance
5 of 12 buildings are over their cap today. By 2030 it is 10. Three buildings carry 54% of the exposure, so where you start matters more than how much you spend.
Bars are colored by priority: fix first, plan next. Illustrative portfolio.
Ranked by exposure
Every building ranked by its penalty from 2030. The last column says what to do with it.
| Building | Area | Today | From 2030 | Cut needed | Priority | |
|---|---|---|---|---|---|---|
| G | Westbrook Co-opApartments · Upper West Side | 240k | $48,817 | $165,637 | 39% | Fix first |
| C | Meridian HotelHotel · Long Island City | 210k | $23,840 | $121,247 | 29% | Fix first |
| A | Atlas TowerOffice · Midtown, Manhattan | 420k | $0 | $96,357 | 16% | Fix first |
| D | Linden GardensApartments · Bronx | 150k | $16,717 | $92,623 | 36% | Fix first |
| B | Harbor CourtApartments · Brooklyn Heights | 180k | $693 | $84,836 | 30% | Plan next |
| J | Riverside CommonsApartments · Harlem | 130k | $3,903 | $72,196 | 34% | Plan next |
| I | Crescent PlazaRetail · Jamaica, Queens | 110k | $0 | $25,040 | 17% | Plan next |
| E | Foundry LoftsApartments · Williamsburg | 95k | $0 | $23,633 | 19% | Plan next |
| L | Bayview ApartmentsApartments · Bay Ridge | 70k | $0 | $16,955 | 18% | Plan next |
| H | Kingsway StorageStorage · Staten Island | 130k | $0 | $12,664 | 25% | Plan next |
| F | Pine Street OfficesOffice · Downtown Brooklyn | 160k | $0 | $0 | 0% | Watch |
| K | Union AnnexOffice · Flatiron | 85k | $0 | $0 | 0% | Watch |
Penalties are per year. Cut needed is the emissions reduction that brings the building to its 2030 cap. Priority: fix first covers the buildings behind the first 60% of exposure, plan next is every other building over its 2030 cap, watch is under it.
Where to start
Each bubble is a building: further right means a bigger penalty, higher up means a bigger cut is needed, and a larger bubble means a larger building.
Letters match the ranked table. The shaded band marks buildings whose gap is small enough that operations and efficiency work may close it. This 20% threshold is an assumption.
Fix first 4
Westbrook Co-op, Meridian Hotel, Atlas Tower, Linden Gardens. Start the audits now. Together 67% of the exposure.
Plan next 6
Harbor Court, Riverside Commons, Crescent Plaza, Foundry Lofts, Bayview Apartments, Kingsway Storage. Smaller penalties. Fold them into the same bids.
Watch 2
Pine Street Offices, Union Annex. Under the 2030 cap today. Check again after each yearly filing.
What to spend
The break-even budget is the most each building should cost before paying the fine is cheaper.
Fines avoided from 2030 to 2034 if every gap is closed by January 2030.
Of that total, the budget for the 4 buildings in the first wave.
Schedule and bundles
Three buildings start each quarter, biggest gaps first, and every building finishes a year or more before the 2030 caps. Buildings with the same kind of fix go out to bid together.
Heating conversion 6
Westbrook Co-op, Linden Gardens, Harbor Court, Riverside Commons, Foundry Lofts, Bayview Apartments. Gas and oil are over three quarters of their 2030 emissions. One heat pump scope, bid together.
Controls and efficiency 4
Meridian Hotel, Atlas Tower, Crescent Plaza, Kingsway Storage. Mixed fuels or mostly electric. Controls, lighting and envelope work, bid together.
Audit first, then quotes and selection, then the work. Dates are a suggested plan, not a commitment.
Data check and next steps
We checked every filing against other city records before running the numbers.
Data check across the portfolio
| Floor area | 3 buildings: the filing and the city property record differ Meridian Hotel, Pine Street Offices, Union Annex |
|---|---|
| Utility data | 2 buildings: a month of gas bills is missing Linden Gardens, Kingsway Storage |
| Occupancy group | 1 building: filed as a different use than the property record Foundry Lofts |
| Fuel types | All 12 buildings report their fuels consistently |
| Benchmarking record | All 12 buildings filed on time for the last 5 years |
This is a planning estimate from each building’s energy use and the city’s published limits. It is not a certified filing: annual reports need a licensed engineer or architect. It is not legal advice, and retrofit prices need an energy audit. The buildings, data-check findings and schedule are illustrative.