Local Law 97 penalty estimate
Classified NYPD Location: $30,005/year in fees starting in 2030
Loading map
What would the estimated penalty be in 2030, assuming nothing changes?
$30,005/year
- Beginning in 2030, the city drops the emissions cap by 46%.
- At the same energy use, Classified NYPD Location will be 112 tons over the cap.
- Penalty is $268/ton over the cap, $30,005 total
202 ton cap112 over
What is the estimated penalty for Classified NYPD Location right now?
$89/year
- NYC caps a building's yearly greenhouse gas emissions.
- Classified NYPD Location is 0 tons over the emissions cap.
- Penalty is $268/ton over the cap, $89 total
378 ton cap0 over
Why does the penalty change in 2030?
- The emissions cap will be lowered by 46% in 2030, from 378 to 202 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 378 to 314 tons.
- Energy use is held the same.
- Tons over go from 0 to 112 tons.
How much would the building need to cut its emissions to avoid the penalty?
36% less emissions than today
- This building must emit 36% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is Classified NYPD Location?
47/100, grade D
- Classified NYPD Location scores 47 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 139 kBtu per sq ft a year.
DCBA
470100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ○The match of this property type to the city's category is still being checked
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Brooklyn
- 784 Rutland Road$1,562,082 a year from 2030
- 5816 Ft. Hamilton Parkway$6,014 a year from 2030
- 860 Pacific Street$3,825 a year from 2030
- 300 Gold St$18,318 a year from 2030
- 1420 Bushwick Ave$17,025 a year from 2030